PROPELLER DISCHARGE
1. Propeller at Rest on Vessel | 2. Propeller at Rest on Vessel | 3. Floating Crane Manouvering towards Vessel |
---|---|---|
4. Tool Box Meeting | 5. Tool Box Meeting | 6. Tool Box Meeting |
7. Crane Manouvering into Position | 8. During rigging | 9. During rigging |
10. Rigging Complete with Final Pre Lift Inspection Being Conducted | 11. Signalling for Lifting | 12. Propeller hoisted |
13. Hoisting of Propeller | 14. Propeller Hoisted Away from Hatch | 15. Continous Minitoring During Manouvering of Propeller Sea Wards |
16. Men At Work | 17. Seaward Manouvering of Propeller | 18. Manouvering of Propeller Shorewards |
19. Receiving of Propeller onto Low Bed | 20. Positioning of Wooden Timbers for Final Landing onto Low Bed | 21. Propeller Landed onto Chassis |